Page 10 - MERC Flip Template

Basic HTML Version

MERC - HYDAC Test Plan
8
6. Quality Assurance/Quality Control
For details, review the Test Plans located at
http://www.maritime-enviro.org
,
then click on Reports.
Treatment and filtration performance evaluations are implemented according to the
Test/QA plans and technical documents (e.g., Standard Operating Procedures) prepared during
planning of the evaluation. Prescribed procedures and a sequence for the work are defined
during the planning stages, and work performed shall follow those procedures and sequence.
Technical procedures shall include methods to assure proper handling and care of test
instruments. All implementation activities are documented and are traceable to the Test/QA plan
and SOPs and to test personnel.
7. Roles and Responsibilities
For details, review the Test Plans located at
http://www.maritime-enviro.org
,
then click on Reports.
The evaluation is coordinated and supervised by the MERC Principal Investigator,
Program Coordinator and MERC personnel. Staffs participate in this test by installing,
maintaining, and operating the respective technologies throughout the test; operating the
reference equipment, collecting the water samples, downloading the data from the instrument
package, and informing the MERC Program Coordinator staff of any problems encountered.
Manufacturer representatives shall train MERC staff in the operation of their filter system.
However, the proper installation, calibration, maintenance, and operation of the systems is
ultimately the responsibility of the manufacturer. QA oversight is provided by the MERC
Program Coordinator. In addition to aiding the development of these protocols, the MERC
Advisory Board will be consulted during the evaluation in the event problems occur, will assist
in the analyses of results, and will review the final Filter Performance Report prior to release.
Specific responsibilities are detailed below.