Page 8 - MERC Flip Template

Basic HTML Version

MERC ER01-10
5
Mechanical Performance
- The BALPURE system itself experienced no mechanical
failures during formal test trials.
QA/QC
- Finally, the MERC Quality Control and Quality Assurance plan was completed
as described in the Test Plan. In summary, there were no adverse findings or problems requiring
corrective action in any of the audits. The testing, sampling, analyses and data handling for this
evaluation met or exceeded MERC test requirements.
* Additional datasets (e.g., in tank values for temperature, salinity, dissolved oxygen, etc., every
15 minutes during hold time) are available upon request.